The Bypass: UDOT’s Heber Valley Corridor Live

The record

The requests that the March 2026 joint letter made of UDOT, the public documents, and the news. Each item links to its source.

What the March letter asked UDOT for

When the Final EIS comes out, this page adds the page that answers each request, and UDOT’s answer in its own words. It does not grade the answers.

The main request (letter, page 1)

“An alternate alignment based on Route B but located as close to the existing US-40 footprint as possible.”

UDOT’s answer so far: UDOT studies a shift of Route B to the east in the North Fields. It says the shift “could reduce impacts to agricultural operations in the North Fields” and could make the route less effective. UDOT project page

28 more requests, counted one for each request that the letter states on its own. Read the letter in the UDOT comment record

UDOT responds to substantive comments in the Final EIS, which it expects in spring 2027. Until then, the requests below wait for that answer. The Draft EIS already covers part of some of them.

Water

  • GIS maps of recharge areas and drinking water source protection zones for each route. Letter, p. 2
  • Chloride and dissolved-solids projections beyond the design year. Letter, p. 2
  • Groundwater monitoring with places, frequency, thresholds, and corrective actions. Letter, p. 2
  • A demonstration that Route B does not raise groundwater risk compared with Route A. Letter, p. 2
  • An assessment of future compliance with the state rules on source protection. Letter, p. 2

Historic

  • An evaluation of the North Fields as a historic district or a farm landscape. Letter, p. 3
  • A clear split between direct effects and effects on the setting. Letter, p. 3
  • A Section 4(f) explanation of the avoidance options and of the plan to reduce harm. Letter, p. 3

Wetlands

  • The legal basis for each aquatic feature, and which findings are preliminary. Letter, p. 4
  • The design changes that UDOT studied to reduce aquatic impacts, and why UDOT rejected them. Letter, p. 5
  • Numbers that support the other significant consequences that favor Route B. Letter, p. 5
  • The status of work with the Army Corps of Engineers, and the documents for the permit record. Letter, p. 5
  • A public appendix with the full comparison tables and data. Letter, p. 5
  • A list of the documents, tables, GIS layers, and reports that UDOT gives the Army Corps. Letter, p. 6

Coordination

  • Recognition of the local coordination effort. Letter, p. 6
  • A schedule of work sessions with UDOT, the cities, the county, and the landowners. Letter, p. 6

Farmland

  • Keep the farmland that UDOT buys, beyond what the road needs, in farm use “to the maximum extent practicable”. Letter, p. 6

Roads

  • A side-by-side table of each road, private access, and farm crossing that either route closes or changes. Letter, p. 7
  • The added travel distance for farm equipment and livestock. Letter, p. 7
  • Farm equipment turning movements at the overpasses. Letter, p. 7
  • Emergency response time and route redundancy models. Letter, p. 7
  • Maps of connections before and after the project. Letter, p. 8
  • The other designs studied: partial grade separation, roundabouts, lower speeds, and context-sensitive design. Letter, p. 8
  • Proof that the closures and overpasses are the least disruptive practical design. Letter, p. 8

Walking

  • A comparison of pedestrian safety and connections for each route. Letter, p. 9
  • An assessment of walking conditions near the historic center of Heber City. Letter, p. 9
  • The effect of interchange design on pedestrian crossings. Letter, p. 9
  • A list of commitments for pedestrian facilities. Letter, p. 9

The letter also makes an offer. The city and the county offer to help find “agricultural lands within Wasatch County that may fulfill the applicable 2:1 mitigation requirement”. (p. 7)

Read the sources

In the news

What comes next

UDOT expects to publish the Final EIS and the Record of Decision in spring 2027, and it says it will give updates when the schedule is final. It posts updates on its project page. This site has no comment form. For an official comment, contact UDOT through its project page.